Final Project
Final project, in production
Due: Friday, December 1, 2023 at 3:00:00 PM
This document is a PLACEHOLDER. The deliverable details and deadline will be finalized by the previous checkpoint deadline.
The final project will be graded similarly to the first checkpoint. I will be grading the final projects based on one the below things:
- The “what does your application do” functionality described in Checkpoint 0.
- Any changes to the above that we have agreed upon since then.
As with the MVP checkpoint, after the deadline I will use your app to determine whether it has the functionality you’ve described. I will start grading it ASAP, so please don’t take time away from your other classes to continue working on it - in fact, unless you have very good CI/CD set up, it would be very risky to continue deploying new versions that you haven’t tested, because you don’t know when I will decide to grade it.
Like the MVP, you can submit a screencast with your assignment to show me how to use your app if I need to know how to do so. I won’t grade that (I will only grade the app as it runs for me), but I will refer to it if I need to.
Importantly, I will only attempt to grade your assignment once, and you’ll get the grade you get. The only reason I would re-grade it is if there was some outage beyond your control (which I can verify using any of the various status pages for the services you’re using, like the netlify status page vercel status page supabase status page etc.